• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
Home Remodeling Reporter

Home Remodeling Reporter

Trending News & Insight about Home Remodeling

  • About – Contact
    • Terms & Conditions
    • Privacy Policy
  • News
  • Home Remodeling
  • Interior Design

Kiewit-Shea JV nabs $1B Baltimore Amtrak tunnel contract

by

This audio is auto-generated. Please let us know if you have feedback.

Award: Frederick Douglass Tunnel
Value: Over $1 billion
Location: Baltimore
Client: Amtrak

Amtrak selected the Kiewit and J.F. Shea Construction joint venture to build the Frederick Douglass Tunnel in Baltimore, the rail agency announced in a Feb. 6 press release. It’s the second of three major components in an $6 billion program to replace the 150-year-old Baltimore & Potomac Tunnel. 

Omaha, Nebraska-based Kiewit and Walnut, California-headquartered J.F. Shea will deliver the pair of rail tunnels through a construction manager at-risk delivery method, per the release.

The aging B&P Tunnel has experienced excessive water infiltration and a sinking floor, and poses the largest bottleneck between Washington, D.C., and New Jersey. The tracks that run through the 1.4-mile-long tunnel under several Baltimore neighborhoods rely on a single structure, so there’s no detour option if it has to close. 

The Frederick Douglass Tunnel will largely replace the B&P Tunnel, and is designed to speed passenger and freight movement on the Northeast Corridor. The new tunnel will have twin single-track, high-capacity tubes that will enable electric Amtrak and MARC trains to travel up to 100 mph. Currently, trains are limited to 30 mph due to the B&P Tunnel’s tight curves.

“We are one step closer to unlocking the biggest passenger rail bottleneck on the Northeast Corridor between Washington, D.C. and New Jersey,” said Amtrak Executive Vice President, Capital Delivery Laura Mason in the release.

Funding for the work is being split among the Federal Railroad Administration, Amtrak and Maryland. The project got an up to $4.7 billion infusion of funding from the federal Infrastructure Investment and Jobs Act in November 2023.

Previously, Amtrak selected a Clark Construction/Stacy and Witbeck joint venture to build the Southern Approach portion of the project. Bethesda, Maryland-based Clark Construction and Alameda, California-headquartered Stacy Witbeck will deliver this $1 billion-plus phase using a construction manager at risk delivery method.

There’s one more major construction contract still up for grabs: tunnel fit out, which includes tunnel track, systems and ventilation facilities. Future procurement details have yet to be announced, but the award is anticipated in 2025 or 2026.

Tunnel construction is scheduled to start in 2026 and the project is slated to finish in 2035.

Filed Under: News

Primary Sidebar

Recent Posts

  • Big Easy Kitchens Adds Small Kitchen Remodeling Service Covering Budget, Mid-Level, and Full-Scale Renovation Projects
  • Home Revive Builders Expands Professional Home Remodeling Services Across the Bay Area – IndyStar
  • 3 Things to Know About Home Depot Stock Before You Buy
  • USA Cabinet Store Expands Bathroom Remodeling Services to Falls Church Following NKBA Award Recognition – AZCentral | The Arizona Republic
  • How Much to Remodel a Kitchen in 2026? A Realistic Cost Breakdown from Kitchen Designers and Remodeling Experts

Copyright © 2026 · All Rights Reserved

Terms and Conditions - Privacy Policy